Structural Work for Older Bel Air Houses

Drainage, then wood, then concrete, then steel: the running order for structural work on an older Bel Air house, with beam work upstairs once the base passes.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Drainage, then wood, then concrete, then steel. That is the running order for structural work on an older Bel Air house, and each stage passes inspection before the next one leans on it. A new anchor is only as good as the sill it clamps, and plywood over a cracked footing just relocates the weakness. Any beam work in the rooms above waits until the base is signed off.

From dry ground to sound concrete

Leaks are repaired and downspouts led away first, because new lumber laid over wet soil starts to decay early. Rotted lengths of sill and cripple stud are then cut out and replaced with treated stock. Cracked footing sections are saw cut, doweled to the old concrete and repoured, then left to cure before any load returns. Once that groundwork is done, the hardware order goes in, sized to the concrete and wood that will actually receive each anchor and strap.

Bracing, then the rooms, then the trim

Anchors go into the stem wall and plywood onto each cripple wall, and LADBS inspects the nailing before the hatch closes. Upstairs work follows: shoring on both sides of a bearing wall, original casings taken down and stored in another room, then the beam. Some Bel Air lots are in mapped fire hazard zones, and if the job opens the attic or eaves on such a lot, vents and soffits may need to meet ember resistance rules. Plaster patches and the original trim close out the job.

About our Structural Work serviceEverything we do in Bel Air