Structural Work for Older Houses in Whittier

An older Whittier house is repaired in order from the soil up: water, then footings, sill, anchors and bracing, with interior beam work saved for last.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Nothing structural on an older Whittier house starts at the top. Water problems come first, since new hardware set on damp wood fails early. Then the foundation is checked and any broken section repaired, the sill and cripple walls are fixed, and anchors and plywood follow. Beam work or wall changes inside wait until the base under them is sound, so the original plaster and trim are disturbed only once.

From the ground up

The first visit sorts problems into that order. Downspouts that dump at the footing, a leaking supply line or soil heaped against the siding get handled before anything else. Next we test the concrete with a hammer and look for cracks that offset the wall. Repairs to the footing then wait for the concrete to cure before anchors are drilled. Only after the sill is sound do we set bolts and nail plywood to the cripple walls, and the inspector sees that work before the crawlspace hatch closes.

Why the rooms come last

Interior structural work, such as a new beam or a stiffened floor, depends on the foundation under it. Doing it last means the posts land on footings already checked, and the house is not shifting while the inside work goes on. It also keeps the disruption to the rooms short. Casings, baseboard and picture rail along the work area are lifted off, labeled and stored, then returned once the city inspector signs the framing. The same sequence holds on a job that turns out to need only part of the list.

About our Structural Work serviceEverything we do in Whittier

Structural Work in Whittier: common questions

Talk to us about your house in Whittier

Send the details and we will set up a walk-through and a written scope.