ADU Construction in Burbank

ADUs and garage conversions in Burbank placed around the old sewer lateral, the electric panel and the gas meter, and designed to suit the main house.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

The exit point of the old sewer lateral can decide where a Burbank ADU sits. A unit whose drain can fall toward the existing line flows by gravity, and one set lower than it may need an ejector pump. On the opening walk-through we find the lateral, the electric panel and the gas meter, then sketch the unit around them, so trench routes stay short and the old foundation is left alone.

Burbank Water and Power and the panel

Burbank runs its own electric utility, Burbank Water and Power, so a service upgrade for an ADU is coordinated with that utility as well as the city's building division. Before the design is fixed we total the planned loads: heat pump, water heater, range, laundry and any car charger. That figure tells us whether the main house's panel can feed a subpanel or whether a new service is the cleaner path. An older house may also hide a fuse box or knob-and-tube circuits, and those are worth replacing while the trench is open and an electrician is already on the job.

Gas or all-electric

An old gas meter sized for a furnace and a stove may have no room for a second kitchen and water heater. We ask early whether the unit will be all-electric, which removes the gas question and leaves the meter where it is. If gas is wanted, the utility may need to upsize the meter, and the pipe run gets sized for the added length. Either way the decision feeds the panel math and the trench plan, so it is settled before the plans go to the Burbank building division for review.

About our ADU Construction serviceEverything we do in Burbank

ADU Construction in Burbank: common questions

Talk to us about your house in Burbank

Send the details and we will set up a walk-through and a written scope.