Full Home Remodeling for Older Monterey Park Houses

Older Monterey Park houses remodeled with a second bath fitted into a closet, hall or porch, drains and vents planned, and the original casings kept in place.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Is there room for a second bathroom without giving up a bedroom? We go looking for the answer with a tape measure on our first walk through an older Monterey Park house. A deep hall closet, the end of a long hallway or part of a back porch already enclosed can each hold a compact bath, if a drain can reach it with proper slope and a vent can rise through the attic.

Working the new bath into the old plan

Once a spot is picked, we sketch the bath around the existing door openings and keep the original casings where the wall is not moving. A pocket door can save swing room in a tight space. The new drain is tied into the main line under the floor, and a fan is ducted outdoors through the roof or a side wall. Tile, fixtures and lighting are chosen to sit comfortably beside the older rooms, and the scope prices the bath as its own phase so you can see what it adds.

Monterey Park permits

The building division in Monterey Park reviews a plan showing the new bath, its drain and vent routing and the fan. If a wall that carries load has to move, an engineer details the header and posts. Inspectors see the rough plumbing under test, the framing and the waterproofing before tile goes on. Any trim removed for the work is labeled and stored, and the new bathroom door is cased to match the profile used along the rest of the hall.

About our Full Home Remodeling serviceEverything we do in Monterey Park

Full Home Remodeling in Monterey Park: common questions

Other work we do in Monterey Park

Talk to us about your house in Monterey Park

Send the details and we will set up a walk-through and a written scope.