ADU Construction in Northridge

ADUs and garage conversions in Northridge, planned around the route materials take past an older house and the utilities it already has.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Before any lumber reaches the back of a Northridge lot, we walk the path it will take. A driveway beside the older house, a side yard between fence and wall, or a gate at the rear decides how framing, drywall and a concrete pour arrive, and how wide the gap must stay so the original eaves, windows and gutters are not scraped along the way. That route shapes the build schedule from the first day.

Getting concrete and framing past the house

When a truck cannot back down the driveway, concrete for the slab is pumped through a hose laid along the side yard, and the forms are set before the pump is booked. Framing lumber comes in bundles carried by hand or on a cart, so the cut list is ordered in lengths that turn the corner. We protect the older house as we go: plywood over the lower siding, padding on the downspouts, and boards across any original brick walk that a loaded cart would crack.

Keeping the main house livable during the build

The house in front stays in use while the unit goes up behind it. We keep one clear walkway to the back door, fence the work area, and plan the utility tie-ins as short shutoffs announced ahead. Trenching for the sewer and power runs is backfilled and compacted soon after it is dug, so the yard is never left open across the path to the garage. Any plaster or trim inside the old house that sits near a new connection is covered before the wall is opened.

About our ADU Construction serviceEverything we do in Northridge

ADU Construction in Northridge: common questions

Talk to us about your house in Northridge

Send the details and we will set up a walk-through and a written scope.