Structural Work for Older West Hills Homes

Structural work for older West Hills homes run in the right order: shoring, footings, posts, beam, inspection and only then the plaster and trim.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Putting a beam into an older West Hills home happens in a strict order, and the ceiling stays supported the whole way through. Temporary walls go up on each side before a single stud comes out. Footings for the new posts are dug and poured next, and the concrete must cure before it takes load. Only then do the posts and beam go in, followed by inspection, plaster and trim.

Shoring and footings first

Temporary stud walls are built a short way back from the wall being removed, snug against the ceiling joists with a plank spreading the load on the floor. Under the house, the spots where new posts will land are marked, and pad footings are excavated to the depth and size on the plan. The inspector checks the holes and any rebar before concrete goes in. While the footings cure, the electrician reroutes any wiring that ran through the old wall.

Beam, inspection, then finish

Once the concrete is ready, posts go onto steel bases bolted to the new footings, and the beam is lifted into place and connected with the hangers and caps the engineer specified. The shoring stays until every connector is nailed off. LADBS then inspects the framing, since West Hills is part of the City of Los Angeles. After it passes, the temporary walls come down, the ceiling and wall patches are plastered, and the original trim is refitted around the new opening.

About our Structural Work serviceEverything we do in West Hills