Full Home Remodeling in Palos Verdes Estates
Older Palos Verdes Estates houses remodeled in a set order: roof and openings made tight first, then framing, systems, inspections and original trim.
The roof and the window openings get settled before any room is touched on an older Palos Verdes Estates house. Once walls are opened for wiring and pipe, the framing inside them is exposed, and damp, salty air or a passing storm finding a gap would soak it. So the shell is made tight first, then the structure, then the systems, and the finishes come last.
Shell, then structure
Roof repairs, new flashing at chimneys and walls, and pans under kept windows come at the start. With the shell dry, the floor frame is leveled and bolted to the foundation, and any wall coming out gets its beam and posts. Drains go in while the subfloor is open, supply lines follow, and electrical rough-in comes after them so no trade cuts through the last one's work. Rough work is inspected before insulation, and insulation is inspected before the walls close.
Finishes and review
Plaster or drywall, tile, cabinets and paint follow the inspections, and the original casings, doors and hardware go back on last so they are not scuffed. The City of Palos Verdes Estates reviews the plans before work begins, and if the lot may lie in the coastal zone, that is answered up front. Exterior hardware is stainless or hot-dipped. Rolling Hills Estates, Rancho Palos Verdes and Redondo Beach houses run in the same order under each city's own department, and the sequence is written into the scope.
About our Full Home Remodeling serviceEverything we do in Palos Verdes Estates
Full Home Remodeling in Palos Verdes Estates: common questions
Hardwood with enough thickness to refinish, original doors and hardware, sound wood sashes and plaster keyed to its lath all earn a place. The scope notes when each piece is removed, where it waits during the work and the step at which it goes back.
Roof and opening work happen from outside while you live in the house. The interior is then split into sections, each opened, roughed in, inspected and closed before the next. A bathroom and somewhere to cook stay in service, and the noisier floor work is grouped together.
Asbestos and lead results for plaster, sheet flooring, mastic and paint are in hand before demolition. We also check the roof deck from the attic for old leaks, look under the floor for missing bolts, test the circuits, pressure-test the water lines and film the sewer.
Full Home Remodeling in other cities
Other work we do in Palos Verdes Estates
Talk to us about your house in Palos Verdes Estates
Send the details and we will set up a walk-through and a written scope.