Structural Work for Older Redondo Beach Homes

Rotted sill plates can hide behind stucco on an older Redondo Beach house. We probe from the crawl space, then replace the sill before any bolts go in.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Behind the stucco of an older Redondo Beach house, the wood sill that rests on the foundation can be soft for several feet where a planter bed or a downspout has kept the wall wet. From outside the wall looks fine. Once a probe sinks into that sill from the crawl space, the plan changes: the rotted length is cut out and replaced while the wall above is shored, and only then can anchor bolts hold.

Shoring and replacing a sill

Temporary posts and a short beam are set inside the crawl space to carry the floor joists while the bad section of sill comes out. Studs whose bottoms have rotted are trimmed and blocked, or replaced where the damage runs higher. The new sill is pressure-treated and set on a gasket, then drilled for anchors into the stem wall below. If the concrete itself is crumbling at the top, a new length of foundation may be drawn by the engineer, and that finding moves the price most.

What keeps the new sill dry

Moving the planter away from the wall and carrying the downspout out to a splash block or a drain line stops the water where it starts. The weep strip along the bottom edge of the stucco is cleared so water behind the plaster can escape. Damp ocean air means the new anchors and straps come with a hot-dip zinc finish. Redondo Beach plan check reviews any engineered repair, and an inspector sees the sill, bolts and blocking before the crawl-space vent covers go back. Soil along that wall is lowered so it sits below the sill.

About our Structural Work serviceEverything we do in Redondo Beach

Structural Work in Redondo Beach: common questions

Talk to us about your house in Redondo Beach

Send the details and we will set up a walk-through and a written scope.