Redondo Beach ADU Construction Around the Gas Meter

Redondo Beach ADU construction placed around the gas meter's clearances, with the gas line sized for both buildings and an older house left intact.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Chalk lines around the gas meter come before the unit's outline on a Redondo Beach lot. The meter and its regulator need clear space in front for reading and service, and the regulator's vent has to keep its distance from any door, window or air intake. Once those clearances are marked on the ground, the footprint, the unit's entry and its windows are placed around them.

Sizing gas for 2 buildings

If the unit will cook, heat water or warm its rooms with gas, every appliance in both buildings is added up, and the pipe is sized for that total and for the length of the run to the unit. A long run or a large total can call for a bigger pipe or a higher delivery pressure, which the gas utility has to approve. The utility also decides whether the old meter can stay or must be swapped for a larger one, and it does that work on its own schedule.

Protecting the meter during the build

A gas meter beside a construction path is easy to strike with a wheelbarrow or a lumber bundle, so we put a sturdy guard around it for the length of the job. Before any trench is dug near the meter or the service line, a call to 811 brings the utilities out to mark their lines, and digging near those marks is done by hand. Materials are staged away from the riser, and the meter stays reachable for reading and for an emergency shutoff throughout.

About our ADU Construction serviceEverything we do in Redondo Beach

ADU Construction in Redondo Beach: common questions

Talk to us about your house in Redondo Beach

Send the details and we will set up a walk-through and a written scope.