Torrance ADU Construction With a Drained Wall

Torrance ADUs with furring or a drainage mat behind the siding, so the wall dries from behind, and trim sized to the older main house over that gap.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Furring strips or a drainage mat set behind the siding give a Torrance ADU a rainscreen: a thin cavity where any water that gets past the cladding runs down and out at the base. A coastal lot can see wind-driven rain and long damp spells, and a wall with that cavity dries from the back as well as the face. The house wrap behind it remains the actual water barrier, lapped like shingles from the bottom up.

Details at the top and bottom of the cavity

A rainscreen needs both air and water to move through it. At the base of the wall, a perforated closure strip keeps insects out while letting water drain and air enter, and at the top, the cavity vents under the eave. Each window sits on a sill pan with flashing lapped so that water reaches the face of the cavity and never the framing. Because the siding stands out from the wall, the casing and corner boards are made thicker, which also suits an older house whose trim stands proud of its boards.

Finishes and the city's review

Siding and trim go up primed on all faces with cut ends sealed, so moisture in the cavity finds no raw edge to soak into. A high-grade acrylic paint stays flexible as the boards move between damp and dry weeks. The City of Torrance runs its own building and safety division, and our drawings show the rainscreen in section, so the inspector sees how the wall is meant to work before the siding closes it in. The main house's siding is left alone unless its own wall shows damage.

About our ADU Construction serviceEverything we do in Torrance

ADU Construction in Torrance: common questions

Talk to us about your house in Torrance

Send the details and we will set up a walk-through and a written scope.