Full Home Remodeling for Older Playa Vista Houses
Older Playa Vista houses remodeled whole, with damp framing measured on the first walk, rot spliced, sashes kept and LADBS and coastal review handled.
Has the damp, salty air already reached the framing? For an older Playa Vista house, that question gets a measured answer during the first walk through. A moisture meter goes on the window sills and door thresholds, an awl tests the bottom plate where siding meets the foundation, and the readings decide how much framing repair the whole-house remodel carries before any new wiring or pipe goes in.
Reading the house for an honest answer
Low readings and firm wood mean the framing stays and the scope moves on to systems and layout. Soft spots at a sill or the base of a wall are cut back to sound wood, and new treated lumber is spliced in with stainless fasteners. Window frames that resist the awl are reglazed and kept with their original casing. Wiring and supply pipe are replaced throughout regardless, since they sit inside the walls and add nothing to the look. You get the readings and photos with the quote.
Who reviews the permit
LADBS takes the plans for Playa Vista, since it is part of the City of Los Angeles, and inspects the work. A parcel may also be inside the coastal zone, which can add a coastal review before the building permit, and we find that out before filing. Inspectors come out for the framing, the rough systems, the insulation and a final walk. Culver City and El Segundo run their own building departments, and Marina del Rey is reviewed by Los Angeles County, though the order of work stays the same in each.
About our Full Home Remodeling serviceEverything we do in Playa Vista
Full Home Remodeling in Playa Vista: common questions
Sashes and frames that hold up to a probe stay, with their hinges, knobs and casings, along with built-ins and plaster that is still keyed. A sill softened by damp air is spliced so the window itself can be kept. Each kept part is named in the scope with a short reason.
Rooms that are finished or not yet touched stay yours while one phase runs behind a sealed plastic wall, with a fan sending dust outdoors. A bath and a spot to cook stay working. Every phase closes with an inspection, and the order of phases is set in the scope before demolition.
Asbestos and lead are tested from small pieces of plaster, vinyl flooring, adhesive, ceiling texture and painted wood before removal starts. Then the circuits are checked for ground, the supply pipes take a pressure test, and a camera travels the sewer line.
Full Home Remodeling in other cities
Other work we do in Playa Vista
Talk to us about your house in Playa Vista
Send the details and we will set up a walk-through and a written scope.

