Full Home Remodeling for Older El Segundo Houses
Older El Segundo houses remodeled whole with shear walls, hold-downs and sill bolts drawn for city review, corrosion-resistant connectors and sashes kept.
Shear walls, hold-downs and the bolts that tie the sill to the foundation are what El Segundo's building department reviews closely when an older house is remodeled throughout. Opening walls for new wiring and a new layout changes how the house resists sideways force, so the reviewer wants that load path drawn and the connectors named. We have the engineer set it out before the plans are filed.
What the engineer puts on the plans
Where a bearing wall comes out, the drawings show the new beam, its posts and the footings below them. Where plaster is stripped from an exterior wall, plywood sheathing may be added and nailed to a set schedule, with hold-downs at the ends. Anchor bolts and plate washers are spaced along the sill. Because the house sits in damp, salty air, connectors and nails are specified in stainless or hot-dipped galvanized steel. The reviewer reads those notes beside the energy forms and the electrical load sheet.
From plan check to final
Once the city issues the permit, its inspectors check foundation bolting and framing first, with the engineer's sheet in hand, then rough wiring and plumbing, insulation and the final. Each is a hold point. A parcel within the coastal zone may need a coastal review ahead of the permit, which we confirm early. Kept sashes, doors and casings leave the house or go to a dry room until paint is done. Manhattan Beach and Hermosa Beach run their own departments with steps much like these.
About our Full Home Remodeling serviceEverything we do in El Segundo
Full Home Remodeling in El Segundo: common questions
The reviewer cares about structure, so the keep list is decided by condition: wood sashes in firm frames, panel doors, casings, built-ins, picture rail and floors that can be refinished. Exterior trim softened by damp air is spliced where enough wood remains. Each kept piece is listed in the scope with why it stays.
Portions of the house are taken one after another, each sealed with plastic and a fan sending dust outside, while you keep a bath, a cooking area and the other rooms. A portion closes with its city inspections before the next opens, in the order the scope sets out.
Lead and asbestos come back on a lab report before anything is removed, from plaster and floor tile chips, mastic, ceiling texture and painted trim. We also measure whether each circuit is grounded, pressure test the supply pipe and film the sewer lateral.