Full Home Remodeling for Sherman Oaks Older Homes
Full-house remodeling for older Sherman Oaks homes: how much wiring must go, settled on the first visit, with plaster, windows and built-ins kept.
"Does all the wiring have to go, or only what runs to the rooms we change?" On a first visit to an older Sherman Oaks home, our answer depends on what the panel and a few opened boxes show. Cloth-insulated wire or a system with no ground generally means every circuit is replaced while the walls are open, and the work is routed around the plaster, windows and built-ins that stay.
Settling it on the walk-through
We open a handful of outlet and switch boxes, look at the insulation on the conductors, test for a ground and read the label inside the panel. If the old wire is brittle where it enters a box, the case for a full rewire is plain. If later cable already serves part of the house, that run may stay once it is tested. The written scope that follows shows which circuits are kept, which are replaced and where each new run goes, so the plaster opened to reach them is no more than the job needs.
LADBS review in Sherman Oaks
Sherman Oaks work is permitted by LADBS, since the neighborhood lies within Los Angeles city limits. Its electrical inspector looks at the new panel, the grounding and every rough circuit with the cavities exposed, alongside the plumbing and framing inspections. Insulation gets a separate look, and the final closes the permit. Casings and doors are labeled before removal and stored until their walls pass. Houses near Encino, Van Nuys or Valley Glen go through the same LADBS steps, since those neighborhoods are within the city as well.
About our Full Home Remodeling serviceEverything we do in Sherman Oaks
Full Home Remodeling in Sherman Oaks: common questions
Doors with their original knobs and hinges, sashes worth restoring, built-in bookcases, plaster that is still keyed and hardwood under old carpet head the list. Each is judged on site by its condition. The scope then shows what stays, what gets repaired and what is replaced, with the reason written beside every item.
The house is split so part of it stays livable. Sealed dust walls close off whatever is under construction, leaving you a bathroom plus a sink and counter for cooking. Electrical and plumbing go in through the whole house before the kitchen or baths are rebuilt, and floors and paint wait for the end. A move-out quote is available too.
Small samples of flooring, glue, plaster, duct insulation and paint are sent out for asbestos and lead results. If one is positive, a licensed abatement contractor removes it ahead of demolition and the scope shows the step. We test the outlets for a ground and film the sewer lateral before the plumbing plan is drawn.
Full Home Remodeling in other cities
Other work we do in Sherman Oaks
Talk to us about your house in Sherman Oaks
Send the details and we will set up a walk-through and a written scope.

