Full Home Remodeling for Older Sun Valley Houses
Older Sun Valley houses remodeled whole and ready for each LADBS visit: framing, rough wiring and pipe, insulation and final, with sound windows kept.
Strapping on the water heater, arc-fault breakers on bedroom circuits and smoke alarms in each bedroom and the hall outside are a few of the items an LADBS inspector checks at the final of a whole-house remodel in Sun Valley. Earlier visits look at framing, bolting and the rough wiring and pipe. We keep a list of those items for every stage, so nothing in an older house is missed before its wall closes.
The checks before the walls close
At framing, the inspector compares the beam and posts on site with the engineered sheet for any bearing wall that moved, and looks for foundation anchors at the sill. At rough electrical, new boxes, cable staples and grounding are checked, and the panel is matched to its load calculation. Rough plumbing is inspected under a water or air test on new supply and drain lines. Insulation gets its own visit before drywall or plaster patches go up. Every visit is a stop written into our schedule.
Kept windows and the LADBS file
Repairing an original window in place usually keeps it out of the energy forms that a replacement window would need, which is one reason the sound ones stay. Their sashes come out for reglazing and return on new cord where the weights still work, and the casings are stored with the doors until paint. Sun Valley is in the City of Los Angeles, so LADBS holds the permit file. The same is true for Arleta, Pacoima and North Hollywood, where the inspection order runs the same way.
About our Full Home Remodeling serviceEverything we do in Sun Valley
Full Home Remodeling in Sun Valley: common questions
An inspector has no say over the trim you keep, so the choice rests on condition: sashes and frames that pass a probe, panel doors, wood casing, built-ins and plaster that has kept its grip on the lath. Each piece is checked on the walk, and the scope gives the reason it stays or goes.
You live in the part of the house that is not under work, behind plastic dust walls with a fan venting outdoors. A bath and a kitchen stay available. Inspections are booked section by section, so one area can pass its inspections and be handed back before the next is opened.
Lead and asbestos samples are taken from paint, plaster, floor tile and its glue, and ceiling texture, and the lab report decides whether abatement comes first. The grounding at the panel is measured, the supply lines are held at test pressure, and the drain line is filmed back to the street connection.
Full Home Remodeling in other cities
Other work we do in Sun Valley
Talk to us about your house in Sun Valley
Send the details and we will set up a walk-through and a written scope.

