Valley Glen ADU Construction Before the House Remodel

Valley Glen ADUs built and finished first, so the unit can be lived in while the older main house is rewired, repiped and remodeled room by room.

Tell us about the house

We reply with a time to walk the house, then a written scope you can read line by line. How we use your details.

To send, add your first name and a phone number or an email.

Could we move into the unit while the old house is remodeled? That order can work on a Valley Glen lot, and it suits a house due for new wiring, pipes and plaster throughout. The ADU is built and passes its final inspection first, its utilities run so the house work never shuts them off, and then the main house can be emptied and opened up without anyone living in the dust.

Order of work across the lot

Sequence shapes the details. The unit's feeder and water line are planned so that work on the main house never cuts them, which can mean a separate LADWP meter for the unit or a new main panel set before the house is opened. The unit's kitchen and laundry are sized for full-time use from the start. Once the unit is finaled and occupied, the main house is tested for asbestos and lead, then opened room by room where the remodel calls for it.

What the old house keeps

With nobody living in it, the main house can be worked without temporary kitchens or nightly cleanup. Original trim that has to come off is numbered and stored in a dry, locked space on the lot, wood windows are restored on site, and the front door stays on its hinges behind protection. Rewiring and repiping go through walls opened only where needed, so the plaster that can stay does, and the rooflines and street face of the house are left as they were.

About our ADU Construction serviceEverything we do in Valley Glen

ADU Construction in Valley Glen: common questions

Talk to us about your house in Valley Glen

Send the details and we will set up a walk-through and a written scope.