Commercial Construction in Sherman Oaks for Older Buildings
The electrical service checked first, then a written scope for systems, access and structure.
"Is there enough power in this building for what we plan to run?" In an older Sherman Oaks commercial building, the answer is printed on the main panel and the meter. The amp rating, the open breaker spaces and the size of the service conductors show whether new equipment fits. If the service falls short, the utility, the meter location and possibly a trench all join the scope before a layout is drawn.
Reading the service
An electrician totals the existing load and adds what the new use brings: cooking equipment, heavier cooling, extra lighting or a server closet. If that sum outruns the panel, the choice is a larger service or a smaller equipment list. A new service means utility coordination, a new meter section and sometimes a trench to the pole or vault, and each of those steps has its own approval. Brittle cloth wiring or a panel brand with a history of failed breakers moves the job toward new circuits throughout.
What else the visit covers
Power is one part of the picture. Drains are filmed, the roof framing is checked where it meets the walls, and the slab is sounded for voids. Sherman Oaks plans are reviewed by LADBS for the City of Los Angeles, and its inspectors check the work in the field. The visit also records the front of the building, its bulkhead, glass and trim, so repairs can follow the original profiles and keep the street face as it stands. Photos of each finding go into the job file next to the matching scope item.
About our Commercial Construction serviceEverything we do in Sherman Oaks
Commercial Construction in Sherman Oaks: common questions
It varies with the use. Accessibility comes first in any altered area, then service size, the count of toilets and sinks the occupant load requires, a fire-rated wall where neighboring uses differ and anchorage of walls to roof. When the occupancy group changes, LADBS looks wider. Every item is priced before demolition.
Often it can. Sound brick, wood, metal and glass get repaired and refinished on the spot as the systems behind them are renewed. A broken pane is replaced with safety glass, and the door is refit with accessible hardware. Pieces past repair are measured and matched before removal.
You can bring an architect, or we engage one for you. We coordinate the electrical and structural engineers, file the plans with LADBS, respond to plan check comments and book the inspections in order until the job is finaled.